Al. most. finished… ┬áThe siding is all installed now, except for some pieces of fascia. Those pieces will be installed at the same time as the snow fences.

DSC_0866
DSC_0855
DSC_0831
DSC_0857

DSC_0842

Inside, the painter is priming the walls and preparations are made for the installations of finish floors.

DSC_0827
DSC_0828
DSC_0822
Tom painting in the entry
DSC_0819
Electrical in-floor heating in the master bath room