Skip to content
Ecocentric DesignEcocentric Design
  • Home
  • Portfolio
  • About
  • Contact
Menu Close
  • Home
  • Portfolio
  • About
  • Contact

the Ridge

the Ridge: 1st floor

  • Post author:Hajo Meijer
  • Post category:Projects/the Ridge
  • Post comments:0 Comments
  • Post last modified:September 24, 2012

Today the crew finished up the subfloor of the main floor. The stair well. Shawn applies glue to the top of I-joists. Shawn (the other one) nails down the plywood.…

Continue Readingthe Ridge: 1st floor

the Ridge: deck beams

  • Post author:Hajo Meijer
  • Post category:Projects/the Ridge
  • Post comments:0 Comments
  • Post last modified:September 20, 2012

Yesterday was another big day on the Ridge building site: the crew installed the main floor/deck beams!

Continue Readingthe Ridge: deck beams

the Ridge: Walls & Beams

  • Post author:Hajo Meijer
  • Post category:Projects/the Ridge/Uncategorized
  • Post comments:0 Comments
  • Post last modified:September 18, 2012

Things are really moving ahead now! The basement exterior walls are framed up and being sheathed. And... the first load of glue-lam (deck) beams arrived yesterday! Today, timber framer Christopher…

Continue Readingthe Ridge: Walls & Beams
  • Go to the previous page
  • 1
  • …
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • Go to the next page

Building Sustainable Dreams | Passive House | Eco House | Living Community

Copyright © 2025. All rights reserved. Ecocentric Design. Web Development by Just Luv It.