Last week the deck floor was build, with the EPDM waterproofing membrane installed, more fill has been brought in for under the garage slab and foundation back fill (now the floor is on) and the main floor wall framing has been started.
Fill for under the garage slab.
Rock wall, created by Sean Brenton from rock collected on site during excavation, to make up the grade difference on the north side.
Sean and Rob building a rock wall on the other side.
Deck framing and plywood installed.
Interior walls laid out (bottom plates)
Shawn and Shawn*) building the first wall (west living room wall).
For real, Shawn, Shawn and Sean are all working on this project! 🙂