Kaslo Passive House construction has reached lock-up – the house in enclosed. The walls are up, the roof is on and the doors and windows are installed. The house is weather tight – Let winter come!
South facade with lots of windows.
South-west view with the covered entrance to the basement on the left.
South-east view. The air-lock entry, on the right, is outside the heated envelope.
North-east view. Note the angle between the main house and the entry. The main house is facing due south, while the entries and trellis align with the street grid.
North facade. Note the few small windows.
Kaslo Passive House wrapped up.